Opening Updates

06.25.25

Certificate of Occupancy secured. Public Opening July 7th.

To our Pre-Sale Members:

Indoor golf simulation room with large screen displaying a golf course, golf clubs, golf bag, and seating area with chairs and a TV.

05.25.25

Sneak peek of the space. We’re in the final round of approvals for a public opening. Stay tuned, and thank you all, especially our founding members, for hanging on.

04.28.25

No spoiler photos here, but we’re ready to open, just waiting on Jersey City for final approvals. We’ve hired an expediter as the process has been dragging with Department of Building for over a month now. Thanks everyone for hanging on!

Golf ball on tee next to a red TRACKMAN launch monitor with golf clubs in a black golf bag in the background.
A golf course with green grass and trees under a partly cloudy sky, with a digital golf simulation screen displaying hole information and map.

04.03.25

We passed all initial inspections!!!! You’ll start to see work inside picking up as we ramp up towards our soft opening.

03.20.25

Hey all! Unfortunately we’re being held up by the DOB and Fire inspector, pending updates to the fire alarm. Appreciate everyone holding tight.

03.11.25

We hit a snag with our fire sprinkler inspections. Re-inspections are happening on the 13th. Final inspections for our certificate of occupancy are now scheduled for the 17th.

03.10.25

Paint to start going up, and Trackman units have arrived!

Three brown cardboard boxes stacked on the floor with a white box on top of the stack, featuring an image of a red and black device labeled 'Trackman' against a plain white wall.

02.27.25

Final inspections on the space are starting tomorrow, with installation of the cages, turf, seating and  Trackman units soon to follow. Stay tuned.

Construction site with partially finished walls, exposed pipes, and electrical wiring. There is a large box of construction materials on the floor, and an unfinished ceiling.

02.17.25

Bathrooms are almost complete. Tile is up!!

A small utility room under construction with white tiled walls, a utility sink, and an unfinished wall area with green drywall patches.
An unfinished room, possibly a bathroom, with marble-patterned tiled walls, a toilet seat on the floor, a cardboard box in the corner, and construction materials on the floor.

02.07.25

Trackman is ordered! Our space is almost ready, and you’ll start to see black paint going up on the ceiling and walls. Turf is coming next. Follow our socials above to get notified when we open!